As stated in the September 25 meeting summary email, this email serves to provide additional data.
- Cost Drivers have been updated for the 3 school option and 2 school reconfigured option. First estimates to renovate for the 2 school reconfigured option: Total: $167,750
- Class sizes if each grade level is reduced by one teacher (2 teachers at 5th grade level). K- 15, 1st - 18, 2nd - 17, 3rd - 19, 4th - 17, 5th - 21 (reduction of 2 teachers), 6th - 20
- Potential floor plans for 2 school option showing no modular additions needed if each grade level is reduced by one teacher (2 teachers at 5th grade level).
- New estimates from EMC on heating and ventilation. Since the failed May referendum ($5 million) and a new Operation Director starting, previous quotes were revisited. MCS estimate is now: $2,470,120. ESS estimate is now: $2,753,000. PCS estimate is now $2,214,000. This totals: $7,437,120
- Community Forum: October 19, 8:00-9:30AM and 6:00 - 7:30PM. Location:TBA
All information is on the Futures website: https://www.rsu16.org/about/futures-task-force in a sub-section for the Steering Committee.
Steering Committee membership: Todd Sanders, Amy Hediger, John Hawley, Randy Lautz, Sarah Robinson, Emily Rinchich, Mary Martin.
- Community Forum
- Elementary Schools Student Enrollment 2011 - 2023
- Aerial Maps and 2020 Census Data
- November 13, 2023 Community Meeting
- November 6, 2023 Update
- October 17 School Board Presentation
- 6th Grade Placement
- September 27, 2023 Update
- Two-School Renovation Costs
- 2 Options Cost Drivers
- New Heating and Vent Quotes
- Grades PreK-2 (2 School Option)
- Grades 3-6 (2 Schools Option)
- Homeschool and Superintendent Agreement Information 2023
- September 18th, 2023 FTFSC
This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.